Eletson: nine LEG carriers
9 x 12,000 cbm LEG/LPG/Ammonia/VCM-Carrier
‘LEG Othoni’, ‘LEG Astipalea’, ‘LEG Paros’, ‘LEG Kithnos’, ‘LEG Dilos’, ‘LEG Ithaki’, ’LEG Kalolimnos’, ‘LEG Kithira’ & ‘LEG Antikithira’
for Eletson, Greece
9 x 12,000 cbm LEG/LPG/Ammonia/VCM-Carrier
‘LEG Othoni’, ‘LEG Astipalea’, ‘LEG Paros’, ‘LEG Kithnos’, ‘LEG Dilos’, ‘LEG Ithaki’, ’LEG Kalolimnos’, ‘LEG Kithira’ & ‘LEG Antikithira’
for Eletson, Greece
| Project Data: | 2637 A-J |
|---|---|
| Shipyard: | Hyundai Mipo Dockyard, Korea |
| Year of Completion: | 2015-2018 |
| Classification: | LRS |
| TGE’s scope: | EPCS-contract, cargo handling system, cargo tanks |


| Length o.a. | 147.06 m |
|---|---|
| Beam: | 22.6 m |
| Draught (LPG): | 9.2 m |
| Speed: | 16.5 kn |
| Characteristics of gas plant: | |
|---|---|
| Capacity: | Capacity: 12,000 m³ |
| Number of cargo tanks: | 3 (cylindrical type) |
| Material of cargo tanks: | 5% Ni Steel |
| Cargoes: | LEG/LPG/Ammonia/VCM |
| Design temperature / pressure: | -104°C / 5.0 bar g acc. to IMO at sea |
| Maximum cargo density: | VCM |
| Number of segregations: | 2 |
| Cargo manifolds: | 2 liquid lines, 1 x 10”, 1 x 8” ANSI 300 lbs flanges 2 vapour lines, 1 x 6”, 1 x 4” ANSI 300 lbs flanges |
| Loading- / Unloadingrate: | 1,200 m³/h |
| Deepwell pump | 3 x 400 m³/h at 120 m LC |
| Booster pump | 2 x 400 m³/h at 120 m LC |
| Number of cargo heater / vaporiser: | Capacity: 1 x 400 m³/h Propane from -42°C to 0°C at 15°C sea-water temperature Capacity: 1 x 1,200 m³/h Propane from -42°C to 0°C at 15°C sea-water temperature |
| 1 ethylene vaporiser | Capacity: 1,200 m³/h Ethylene from -104°C at 15°C sea-water temperature |
| Reliquefaction system: | Cascade / direct cycle 2 x refrigerant compressors (refrigerant Propylene) 3 x cargo compressors |
| Cargo piping system: | Stainless steel AISI 316L |
| Inertgas plant: | |
| PSA type | Capacity: 1,000 Nm³/h at 99.5 vol. % N2 |
| Deck Tank: | Capacity: 1 x 120 m³ |
| Design Pressure / Temperature | 18 bar g/-104°C |


