| Project Data: | 2960 |
|---|---|
| Owner: | SHELL, United Kingdom |
| Shipyard: | STX, Korea |
| Year of Completion: | 2017 |
| Classification: | LR |
| TGE's Scope: | Cargo handling system with cargo tanks, LNG fuel gas system |
| 6,500 cbm LNG Bunker-Vessel | |
|---|---|
| Length o.a. | 119.90 m |
| Beam: | 19.4 m |
| Draught (LNG): | 5.8 m |
| Speed: | 13.0 kn |
| Characteristics of gas plant: | |
|---|---|
| Capacity: | 6,500 m³ |
| Number of cargo tanks: | 2 (cylinder type) |
| Material of cargo tanks: | 9% Ni steel |
| Cargoes: | LNG |
| Design temperature / pressure: | -170°C / 3.5 bar g |
| Maximum cargo density: | 500 kg/m³ |
| Number of segregations: | 1 |
| Cargo manifolds: | 1 liquid line, 1 x 10” DIN 150 lbs flange 1 liquid branch, 1 x 10” DIN 150 lbs flange 1 vapour line, 1 x 8” DIN 150 lbs flange |
| Elevated manifolds: | 1 liquid line, 1 x 16” DIN 150 lbs presentation flange 1 vapour line, 1 x 16” DIN 150 lbs presentation flange |
| Bunker manifolds: | 1 liquid line, 1 x 10” DIN 150 lbs flange 1 vapour line, 1 x 8” DIN 150 lbs flange |
| Loading- / Unloadingrate: | 1,100 m³/h |
| Deepwell pump | 2 x 550 m³/h at 270 mLC |
| BOG-handling & fuel gas system: | 2 x BOG compressors with intercoolers 2 x aftercoolers 2 x submerged fuel gas pumps 1 x forcing vaporiser 1 x fuel gas buffer tank 1 x fuel gas metering system |
| Cargo piping system: | Stainless steel, AISI 316L |
| Inertgas plant: | |
| PSA type | Capacity: 750 Nm³at 99.5 vol. % N2 |
| Membrane system | Capacity: 150 Nm³/h at 3 vol. % O2 |
| Gas combustion unit: (by yard) | Capacity: 1,200 kg/h |